3D hexagonal arrangement of gray cubes in a circle, symbolizing modern technology or digital systems.Big Star Blockchain logo with bold serif typography

Need Power-Qualified Land for AI, HPC, or Mining?

Most sites marketed to AI or Bitcoin operators can't deliver real power. Big Star filters aggressively, selecting only land with provable utility pathways and expansion potential.

Request Site Availability Quote

Answer a few quick questions — it only takes 10 seconds.

We Build Where Compute Can Actually Operate

Most sites marketed to AI or Bitcoin operators can't deliver real power. Big Star filters aggressively, selecting only land with provable utility pathways and expansion potential.

Advantages:

  • Direct relationships with utilities
  • Rigorous multi-point site vetting
  • Proven experience with liquid-cooled and ASIC deployments
  • Rapid feasibility assessments
  • Operator/scenario modeling for long-term scalability

From Raw Land to Deployment-Ready Infrastructure

For operators who already own land — or are evaluating new regions — Big Star can prepare sites for high-density compute through full development services:

Our Capabilities Include:

  • Power feasibility studies
  • Utility routing & application management
  • Civil engineering, grading & prep
  • Environmental studies
  • Substation integration
  • Multi-MW power distribution engineering
  • Long-term expansion planning
Whether you're deploying a 20MW liquid-cooled AI cluster or a 50MW ASIC farm, Big Star manages the process with end-to-end control.

Development-Ready Sites (Generalized until NDA)

Exact coordinates and utility documentation provided only after NCNDA.

Big Star currently controls and evaluates parcels across:

  • Southeast U.S.
  • Texas & Gulf Coast
  • Mountain West
  • Midwest energy corridors
  • 44.7kV–138kV substations
  • Transmission corridors
  • Natural gas & renewable blend zones

What Makes a Site "Energy-Ready"?

Our Evaluation Framework Includes:

Power Infrastructure

  • Substation adjacency
  • Available transformer capacity
  • Redundancy & upgradeability
  • Feasibility of 3-phase 12.47–34.5kV distribution

Utility Coordination

  • Interconnect studies
  • Load forecasting
  • Substation expansion pathways
  • Utility timelines & requirements

Land Characteristics

  • 10–100 acre parcels
  • Minimal remediation requirements
  • Road access + logistics
  • Low NIMBY exposure

Regulatory Landscape

  • Zoning compatibility
  • Permitting predictability
  • Environmental impact readiness

Land Built for the Next Wave of Compute

AI, HPC, and Bitcoin mining operations are capped not by server supply — but by power availability. Big Star solves that bottleneck by delivering fully vetted, development-ready land with clear pathways to utility interconnect.

We identify strategic regions, secure ideal parcels, evaluate power capacity, and prepare sites for rapid deployment.

We focus on land that meets three core criteria:

  • 10–100MW available or expandable capacity
  • Direct proximity to substations or transmission lines
  • Favorable permitting and zoning structures

Energy-Ready Land for AI, HPC & Digital Infrastructure

Big Star sources, acquires, and develops power-qualified sites across the U.S. for high-demand compute environments — from 10MW parcels to 100MW+ development zones.
High voltage power lines at sunset with digital data overlay, symbolizing advanced energy communication.
From energy-ready land to modular data centers and full EPC delivery — Big Star develops the critical infrastructure behind next-generation compute.

Newsletter

Subscribe to our newsletter for updates
© 2025 Big Star Blockchain. All rights reserved.
Big Star Blockchain logo with bold serif typography

Contact A Sales Representative.

Big Star Blockchain logo with bold serif typography

Talk to an Engineer